History of rail transport in Norway

History of rail transport in Norway

This article is part of the history of rail transport by country series

The history of rail transport in Norway had begun by 1805.

Early horse-powered railways

Norway's first railway is believed to have been the 1,400 m (4,593 ft) long horse-powered Damtjern-Storflåtan railway on Krokskogen, which was part of a longer route for timber transport from Land and Valdres to Oslo. The line was opened in 1805 and probably closed in 1849.

The next line was probably the one built on Blaafarveværket in the 1820s, by the German miner Karl Friedrich Böbert. This was a mine railway with its rails laid on cast iron sleepers. It was operated by horses and used to transport ore.

About the same time, the 1,200 m (3,937 ft) long Gjøsbubanen was built on in Mark Østfold. This was a combined canal and railway construction that made possible the transport of timber between the Store Le and Øymarksjøen lakes. Initially, the wagons were drawn up by a device operated by horses or oxen. From 1854, power was supplied by a stationary steam engine. The track was in use from 1825 to 1926.

Mortsjølungen-Tvillingtjern-banen (also known as Grasmobanen) was a similar short line for the transport of timber between two rivers, namely the Mangenvassdraget and the Haldenvassdraget. The line was opened in 1849 and was in operation until 1931. At first, the wagons on this line were pulled by horses. From 1918, a motorized pulley was used. The line was about 1,400 m (4,593 ft) long.

Norway's first public railway

The first public railway in Norway was the Norsk Hoved-jernbane (also known as the Hovedbanen). Work on this line was led by the Englishman Robert Stephenson, son of George Stephenson, who had constructed the first public railway in the world.

The Hovedbanen ran from Oslo to Eidsvold. Its main purpose was to transport lumber from Mjøsa to the capital, but also passenger services were operated. Construction of the line started in 1851 and it was opened on 1 September 1854.

Finance for the Hovedbanen was raised by issuing 2.2 million shares for Norwegian speciedaler. Half the capital was provided by British shareholders and the other half by Norwegian interests, of which the State accounted for just over half.

The Hovedbanen was until 1926 a corporation in which over the years the State acquired more and more of the shares. It was therefore formally a private company, and did not become part of the Norwegian State Railways (Norwegian: Norges Statsbaner) until 4 March 1926.

The section between Kristiania East and Lillestrøm was rebuilt as a double track line in 1902, and the line as a whole was electrified in two portions, in 1927 and 1953. The Hovedbanen was the main line between Oslo and Eidsvoll until 8 October 1998, when the more direct, double-tracked high-speed Gardermoen Line opened, taking away most of the passenger traffic.

Early state railways

After the opening of the Hovedbanen, there was interest in the development of public railways in several places in Norway.

Initially, Norwegian public railways were proposed as one of a number of steps in a longer transport route, combined with transport by sea. For example, the Hovedbanen connected Oslo with steamboats on Lake Mjøsa, allowing steam powered transport to places like Lillehammer, 180 km from Oslo. Similar considerations were the basis for several of the new lines authorised by the Parliament of Norway from 1857.

During the construction period for these lines, which lasted until 1883, all new railways were State railways, organised as corporations. Private investors were invited to subscribe for shares that could provide dividends if there was a surplus. However, such investors were given no influence over the railway's operations. Rather, the Parliament insisted that it not only subscribe for a certain proportion of shares at the start of a project, but also have the power, at a later stage, to adopt the relevant line, and appropriate the remaining part of that line's initial capital.

In the years between 1862 and 1883, a series of more or less isolated lines was opened throughout southern Norway, including isolated railways in central and western Norway. The earliest railways were built to the 1,435 mm (4 ft 8⁄2 in) (standard gauge) but to reduce costs under the influence of Carl Pihl this was changed to 1,067 mm (3 ft 6 in) (Cape gauge). The height of the era came in 1877 when Rørosbanen connected Central Norway to the capital.

In 1883, there was a pause in the construction of several railways. The same year, a new administrative system was launched for the State railways, with a main administration in Christiania and six district administrations in Christiania, Drammen, Hamar, Trondheim, Stavanger and Bergen. The term "De norske Statsbaner" was adopted in 1883, and in December 1885 the term "Norges Statsbaner" was used for the first time.

Chronological list of railways opened to 1890

Private railways

By the 1880s, after some mixed experiences with the model under which the Hovedbanen was built, the State had control of Norwegian railway construction. However, a number of private public railways were opened in Norway between 1892 and 1956. Some of these were developed for the transport needs of individual businesses, while others were ordinary public railways to serve a specific district.

Private railways that were built for a specific company's needs remained in operation the longest. The remainder had, for the most part, already been closed during the interwar years, when they were ousted by road transport.

Rail network development after 1890

The turnaround in railway construction after 1883 was criticized by many. In the previous two decades, Norway had gained national expertise in railway construction. When the construction was stopped, there was a risk that this expertise would be lost.

In the second half of the 1880s, Norway had no shortage of railway plans and wishes. However, the great building boom of the 1870s had been financed in large part by government borrowings abroad. From 1890, there was a willingness to resume the construction of railways. After a few years, a boom was in full swing again, and it was perhaps even more ambitious than ever.

Three urban railways, in Oslo, Bergen and Trondheim, were started as horsecar systems between 1875 and 1893. They were all electrified around the turn of the century.

The second construction boom of the main railway arose in the 1910s and included the Bergensbane across Finse to Bergen, connecting eastern and western Norway. Also a number of other larger projects were built through the 1920s, including a second line, Dovrebanen, to Trondheim. This period also saw the first electrified railways and a steady conversion from Cape gauge to standard gauge. Norway chose to electrify its rail network at 15 kV 16⅔ Hz AC.

During World War II, the development of the network was a priority for the German occupation forces, as part of the creation of Festung Norwegen. Several lines were extended or constructed, with mostly poor quality results. In particular, the Nordlandsbanen was extended a long distance to Dunderland, the Flam Railway was opened in 1941, and the entire Sørlandsbanen was completed at Stavanger in 1944.

See also

Notes

References

  • Bergsgård, Arne (1964). "Kommunikasjonar [Communications]". Norsk historie 1814–1880 [Norwegian History 1814-1880]. Oslo: Det Norske Samlaget. (Norwegian)
  • Berntsen, Ulf (1973). "Gjøsbubanen". På Sporet (Norsk Jernbaneklubb) (12): 23. (Norwegian)
  • Bjerke, Thor; Holom, Finn (2004). Banedata 2004. Data om infrastrukturen til jernbanene i Norge [Raildata 2004. Data on the infrastructure of the railways in Norway]. Hamar/Oslo: Norsk Jernbanemuseum & Norsk Jernbaneklubb. (Norwegian)
  • Hajum, Erik (1977). "Jernbanetanken vinner frem [Rail idea wins out]". Innenlands samferdsel i Norge siden 1800 [Domestic transport in Norway since 1800]. Oslo: TØI/Grøndahl. (Norwegian)